Project Description

This project consisted of developing a new public park in Lakeside, Montana. The existing project site contained a hotel, small business office, parking areas and a residence. The project consisted of demolishing the existing improvements and developing the site into a new community park, aptly called Volunteer Park.

RPA provided civil engineering services to design improvements to Adams Street, a 37-stall
asphalt parking lot, storm drainage, water and sewer improvements and ADA compliant
bicycle/pedestrian paths through the park. RPA prepared civil technical specifications and
construction drawings. During construction, RPA provided construction administration and
observation for the project.

Robert Peccia & Associates (RPA) also provided civil engineering for the expansion of Volunteer Park in Lakeside, Montana. RPA provided civil engineering for new sidewalk, curb and gutter, drainage and grading. RPA worked with the Montana Department of Transportation to work within their Right-of-Way. The project expanded the Volunteer Park and provided additional green space and pedestrian walkways throughout the park.

KEY PROJECT ELEMENTS:

  • Community Park on Flathead Lake
  • Boat Docks
  • Swimming Area
  • Lakeshore Improvements
  • Asphalt Parking Lot
  • Storm Drainage Improvements
  • MDT Encroachment Permits
  • Construction Administration & Observation

Project Details​

Client

Bruce Boody Landscape Architects

Location

Lakeside, Montana